Renewal of the normal tile plant


In July 2014 we were engaged by Bramac Dachsysteme International for the renewal of the control technology of the cableway from the normal tile plant.

INAUT was responsible for change of the whole electric and control technology concerning the cableway in Pöchlarn. We delivered planning and switchboard design, as well as software for PLC and HMI.

The delivery of the switchboards took place in November, the installation and wiring at the plant in Pöchlarn were performed in December 2014 and January 2015.